Progress report, December 2009
- all the original figure of ‘8’ track has now been lifted and stored for re-use
- a few more pillars have been removed from their original locations and used to increase the height of others in order to show the intended position / level of the new baseboards
- the original access point (the small twin towers) have been demolished and parts put to one side again for re-use
- time constarints have so far prevented the existing ‘OO’ boards and track form being lifted and this is now unlikely to happen before early Jan 2010.
Back to main Garden Railway page